Campus Move-Out Program Checklist & Timeline
The month-by-month checklist for running move-out collection through a move-in resale shop, from spring planning to fall reporting.
August 31, 2026
This is the timeline underneath our full operator's guide to starting a program, laid out as a checklist you can work from directly. It assumes a typical spring move-out / fall move-in academic calendar — shift the dates if your institution runs on a different schedule. For an interactive version that adjusts to your own storage and collection choices, use our Program Planner.
January – February: Secure buy-in and a site
- Get sign-off from housing, sustainability, and facilities offices
- Identify a summer storage location and confirm square footage
- Decide donation-only vs. collect-and-resell (see our model comparison)
- Set a rough budget and staffing plan
March: Recruit and plan logistics
- Recruit or hire student staff and volunteer leads
- Order collection bins, boxes, or carts
- Map collection points to residence halls
- Draft donation guidelines (what's accepted, what isn't)
April: Communicate and prep
- Get signage and donation guidelines in front of every resident, via RAs and hall staff
- Confirm hauling/transport from collection points to storage
- Do a dry run of your inventory or logging process
- Confirm insurance/liability coverage with risk management
May (Move-Out): Collect
- Staff collection points during peak move-out days
- Log items by category and weight as they come in, not after
- Move collected items to summer storage on a rolling basis
- Track volume by building to redeploy staff where it's needed
June – July: Process
- Sort, clean, and repair items as needed
- Price items for resale, or route to donation partners
- Photograph and catalog anything going into a storefront
- Check storage conditions (pests, moisture) periodically
August (Move-In): Sell or distribute
- Open the move-in storefront or distribution event
- Staff pickup windows or a pop-up sale
- Track revenue and units sold if running a resale model
- Collect student feedback for next year
September – October: Report
- Pull total weight diverted, revenue, and students served
- Calculate emissions avoided if you're reporting to AASHE STARS
- Report results to housing, sustainability, and student leadership
- Document what worked and what to change for next year
Where campuses most often lose momentum
Two points on this timeline account for most first-year programs that stall: the March recruiting step (waiting too long to staff up means a scramble in April), and the June–July processing step (a summer with no dedicated staff means inventory sits untouched until move-in is already close). Building both into your staffing plan before move-out, not after, is the single biggest predictor of whether a pilot becomes a permanent program.
Ready to start your program?
Explore our financial calculators, blueprints, and operational manuals to build a self-sustaining circular economy on your campus.