Campus Move-Out Program Checklist & Timeline

The month-by-month checklist for running move-out collection through a move-in resale shop, from spring planning to fall reporting.

August 31, 2026

This is the timeline underneath our full operator's guide to starting a program, laid out as a checklist you can work from directly. It assumes a typical spring move-out / fall move-in academic calendar — shift the dates if your institution runs on a different schedule. For an interactive version that adjusts to your own storage and collection choices, use our Program Planner.

January – February: Secure buy-in and a site

  • Get sign-off from housing, sustainability, and facilities offices
  • Identify a summer storage location and confirm square footage
  • Decide donation-only vs. collect-and-resell (see our model comparison)
  • Set a rough budget and staffing plan

March: Recruit and plan logistics

  • Recruit or hire student staff and volunteer leads
  • Order collection bins, boxes, or carts
  • Map collection points to residence halls
  • Draft donation guidelines (what's accepted, what isn't)

April: Communicate and prep

  • Get signage and donation guidelines in front of every resident, via RAs and hall staff
  • Confirm hauling/transport from collection points to storage
  • Do a dry run of your inventory or logging process
  • Confirm insurance/liability coverage with risk management

May (Move-Out): Collect

  • Staff collection points during peak move-out days
  • Log items by category and weight as they come in, not after
  • Move collected items to summer storage on a rolling basis
  • Track volume by building to redeploy staff where it's needed

June – July: Process

  • Sort, clean, and repair items as needed
  • Price items for resale, or route to donation partners
  • Photograph and catalog anything going into a storefront
  • Check storage conditions (pests, moisture) periodically

August (Move-In): Sell or distribute

  • Open the move-in storefront or distribution event
  • Staff pickup windows or a pop-up sale
  • Track revenue and units sold if running a resale model
  • Collect student feedback for next year

September – October: Report

  • Pull total weight diverted, revenue, and students served
  • Calculate emissions avoided if you're reporting to AASHE STARS
  • Report results to housing, sustainability, and student leadership
  • Document what worked and what to change for next year

Where campuses most often lose momentum

Two points on this timeline account for most first-year programs that stall: the March recruiting step (waiting too long to staff up means a scramble in April), and the June–July processing step (a summer with no dedicated staff means inventory sits untouched until move-in is already close). Building both into your staffing plan before move-out, not after, is the single biggest predictor of whether a pilot becomes a permanent program.